Facility Layout Design Using Activity Relationship Chart and Simulation (Case Study in UKM Bambu Karya Manunggal)

Marni Astuti

Abstract


The current industrial development is required to improve the quality of production by continuing to improve the production process in order to continue to compete in the market, both locally, nationally and internationally. This demand also applies to small and medium industries that have limited capital, labor, land and technology. UKM Karya Manunggal is a small business unit that is engaged in making furniture made from bamboo. Problems of SMEs with available land, most areas are used for placement of work in process and placement of materials that should not be used so that it can disrupt the smooth movement of material movement. Mapping the real conditions of Karya Manunggal UKM by using ProModel software can know the description of material handling, input output from each work station and work in process. The closeness relationship between work stations in the initial conditions compared to using Activity Relationship Chart (ARC), resulted in a distance difference of 90.55 meters or changed by 4.94%. The output of a computer simulation results in a change from one process to another that changes. Initial conditions for raw material operators were 99.4% to 59.2%. The operator of the initial condition pattern was 21.9% to 21.2%. The rattan operator had initial conditions of 7.3% to 4.6%. Operators finish initial conditions 2.7% to 2.3%


Keywords


Material Handling, Work in Process, Activity Relationship Chart, Simulation

Full Text:

PDF

References


Astuti, M., & Nurdin, R. (2017, January). Pemilihan Supplier Yang Tepat Di Ukm Kerajinan Bambu Dengan Menggunakan Metode Analytical Hierarchy Process. In Prosiding Seminar Nasional ReTII..

Nurdin, M. R., & Astuti, M. (2013). Pengembangan Model Work In Process Pada UKM Produk Kerajinan Bambu dengan Pendekatan Metode Antrian dan Simulasi. Model Work In Process, 5, 10.

Wignjosoebroto, S. (1996). Tata Letak Pabrik dan Pemindahan Bahan. Penerbit Guna Widya, Surabaya.

Bowden, R., Ghosh, B. K., & Harrell, C. (2000). Simulation using Promodel.

Poerwanto, E. (2013, December). Perancangan Tata Letak Fasilitas Laboratorium Perawatan Pesawat Terbang. In Conference SENATIK STT Adisutjipto Yogyakarta (Vol. 1, p. 18).

Laksono, G. D., Nurdin, R., & Astuti, M. (2012). Simulasi Sistem Proses Produksi di PT. Baja Kurnia, Batur, Ceper, Klaten. Angkasa: Jurnal Ilmiah Bidang Teknologi, 4(2).

Faishol, M., Hastuti, S., & Ulya, M. (2016). Perancangan Ulang Tata Letak Fasilitas Produksi Pabrik Tahu Srikandi Junok Bangkalan. AGROINTEK, 7(2), 59-67.




DOI: http://dx.doi.org/10.28989/senatik.v4i0.248

Article Metrics

Abstract view : 1522 times
PDF - 961 times

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Conference SENATIK P-ISSN :2337-3881 and  E-ISSN : 2528-1666

Jumlah penggunjung = Web Analytics orang

Statistik Senatik

Flag Counter